All done and squared away.
Now to strip the frame back to nothing , paint and start the build all over again.
Engine finished mid Jan, frame finished end of Jan.
That US Postal service is awesome, I have received over 40 parcels from USA over the last 3 months and the only one hasnt made it, that was the clutch damper rubbers from M3 racing Mcgraw, funny isnt it I had vibes when I was doing the deal that something was going to happen
From Europe I had 4 parcels sent and only the 5th gear from Rob at Voxhonda didnt make it , I havent given up on Robs parcel arriving yet as I post takes about 4 times longer from Europe than US.
I have to stick to the dealine though so as of the first Jan whats not here is not in, the rubbers wont make any performance diference but the 5th gear is ultra important as with the early 5th overdrive it wont pull in top at those type of speeds just hold any RPM dropped in from 4th. Will try and adjust with sprockets and run in 4th.
Got the undercut gears from Cycle X so should hold the load OK.
Time for frame paint , ciao johno