Well, its been a loooooong time since Ive updated. Ive been traveling a lot for work and just haven't had the time to spend much time on the bike. But, Ill hopefully be in town for the next two weeks and can make some good headway! My goal is to at least have the motor installed in the frame and start to rebuild the forks.
I painted the frame with POR-15 Chassis Black, I didn't feel like going all out with POR-15. I think it turned out quite good!
Last night I set the valve clearances and checked the timing. I think the timing is good but Im putting a picture here for you guys to check.
The tick mark should line up with the line on the right when the 1/4 points just begin to open right? (I know the mark in the picture isn't lined up, but the picture is just for reference to the marks). Also, there are another set of marks just after these but before the 2/3 marks. What are these for?
I also took some compression readings. I got 100-110 on all cylinders. I think this will be okay. It hasnt had much oil in it, hasn't been run in a while, and i didnt screw the tester in all that tight. I was mainly looking to make sure all 4 were pretty close to the same.
Next up is to get all the engine mounting pieces painted up so I can get the engine in the frame.
Ill try to update more regularly!