Damn setbacks are killing my time. Pondering what to do with the build. I have 3 pieces left to polish, 4 to zinc and engine top end + bits to paint, all within the next two weeks. After that it will start getting too cold to try and assemble it and get it broken in before storing it. Should I just take my time and let it hibernate over the winter and start assembly in spring? Or try and get it done now, break it in and store it?