Update - August 3rd - got the bottom of the air box and overflow tubes installed. Cleaned some oxidation off the 5 prong male connection and put dielectric on it. Checked and cleaned the other connections. Got the bucket, blinkers, handlebars, levers, cables, MC and gauges installed. Connected the bucket wires and found a broke female ground which will be replaced tomorrow. Left to do is install the carb slides, plugs, new plug wire ends and the battery. Waiting on the gas tank from the painter as he is painting the gold stripes. I have an extra tank to use if I am ready to fire it up and he is not done.