Good to know! I doubt I'll be doing anything ticket-worthy on the bike so I'm not too worried.
Tracking down some used rear spokes so I can actually make it a roller, sent the crank, pistons, and cylinders to APE to get worked on, and I'm just waiting for a day off to drive down to bob smalls to drop my head off. Slowest build ever. Turn around rate on the motor will be a month from APE, and the head will probably take 2 weeks minimum. I've got parts heading in from all over (thank you all so much) so I'll be assembling things as I go.
I'm debating de tabbing the frame (side covers and battery box). Any opinions?