The hour or so of running the bike on the access roadways at Road America provided valuable time to seat the rings in the new bores......same as before.......just new. The day ended with a crash........very minor.......I tipped over while turning at about 2-mph
All scratches on the bike were removed in less than an hour. I had no marks on me and my helmet did not hit the tarmac.
Oil has been changed to HONDA Professional 10w30 synthetic. All looks promising. It was gratifying to have the clutch and tranny working as expected after just a bench tune. Dave and I can hardly believe how well the motor pulls from low RPMs in all gears. 12-days to pack and do the final mount of the fairing.
I'd post a few pics if someone will tell me how.............