As in the title, what's the best sequence to do this in? I have a repro system, so everything is separate, header pipes, collector, muffler. Have all new gaskets and clamps etc in hand.
Left to my own devices I thought I'd mount the collector somewhat loosely to the muffler, mount the muffler to the bike, and then header pipes from cylinders 1-4 in order. Nut everything loosely, wiggle it all to fit and then tighten it up slowly across the headers, finish tightening at the collector.
How do the cool guys do it?