Thanks Canyon, I wish I had the time and $$, it has been 2.5 years!
The swingarm goes in pretty cleanly, I had to grind a few thousands off the inside of the frame to get clearance. The pivot bolt from the 750 is a couple mm smaller dia than the 600's, although the 600's is too short. I still need to find a bolt long enough at the right diameter, or get some steel rod and have it cut and threaded on the ends, then drill out the frame a mm or two. Other than that, welding on the shock mounts is the biggest PIA. The stock 600 wheel spacers work fine, tire is centered on the bike. Front sprocket offset is an issue but I'll have to get one machined up.
The front end is mostly bolt on. Do the steering stem swap, grind the steering stop down to get the right lock to lock, a little grinding on the ignition lock bracket and it's bolted up. Still left is a bracket for the gauges & brake line crossover unless I spring for braided lines. And, I need to source the necessary '93-'94 600 mechanical speedo drive and wheel bearings I guess.
Canyon, any close up pics on mounting the gauges, did you just bolt to the upper triple?