Finally got the call that my engine was finished but as I'm sure you guys have heard Baltimore has been nuts these past 2 weeks so I couldn't get it from the shop! But I finally did the other day and got right to work! Allen Bolts and high heat VHT Primer and Paint. I thinks it tuned out well!
Bad news is I was attempting to install the new ALL BALLS Bearings in the triple and installed the top race upside down and had to side drill it out to get it out of the frame. So now I need to order a new kit and Have someone who knows what they are doing help me because I was very confused. So now the engine is going to have to wait till I can get bearings installed.
So much stuff going on in my shop recently collecting parts for my next build ( Modern Cafe 550 ) and Monday I am headed to New York to pickup a free load of vintage bike parts that include a 75 Cb750 "Mostly Complete " so that will be take up more space!
Aslo In the meantime while waiting for the engine I have been getting the other 550, 74 with a 77 engine in it ready and cleaned up to sell! Its about time to tie the knot with my girlfriend and hopefully this will pay for a nice ring! If I can sell it!
Things should start rolling now, Ill keep everyone updated!