Tews,
Very good point! I should have done my research before I bought it. My project is rolling along. The only thing that I am waiting for now is the rest of my engine parts to come in. I can't really move any further. The only other things that I have to do is:
-Assemble the rest of the engine. All the engine parts (block, cylinder head, cam shaft, etc.) should be here by the end of the month. Cycle X have had them for a little over a month now.
-I have Mikuni RS34 carburetors on order and I will be running velocity stacks from Steel Dragon.
-I have to finish mounting the oil cooler. I have the oil cooler adapter painted and the hoses are ready to be installed. I'm waiting to get the engine back together before I put it on.
-Then I have to run my lines for the oil tank. I already have the braided nylon lines and AN/NPT fittings ready to go.
-Then I'll get it painted. I'm still looking for a shop here in San Diego to do it for me. I already have the color picked out. I just need to find someone that can match it at a reasonable price.
-The last thing that I will do is take my bike back to my buddy's shop so he can modify the exhaust that I have sitting in my garage. I'm doing something pretty cool with my exhaust, but I can't spill the beans just yet.
After all of this I'll go over it again and make sure that everything is tightened up and I'll hopefully be able to fire her up.