More progress updates! Things are flyin along! Good thing too, bike is due Friday for the show!
Rearsets, check:
LOVE these things. Smooth as hell, beautiful shift feel, perfectly positionable, gorgeous. Worth the money!
Front gauge, brakes, cable maangement and wiring: Check
Ended up running the clutch cable below the headlight, much straighter line and it's smooth as butter now.
Tail pan with under-side brake and signal lights: Check.
A paper template, a hacksaw, sandpaper, a few hours. Happy with it, fits great. My clearance to the brake light isnt quite enough but I'll set the rear end stiff for now until I have time to suck it up a bit higher into the underside of the pan.
Points set, valve lash set, final wiring connected and managed, quick carb cleanout, final bolt check through the bike annnnnd shes a runner!
Back to being the first kick engine she always has been for me! So excited! First gear feels very solid (transmission replaced due to it jumping out before) from a short indoor ride in the shop. It snowed 20cm this weekend in Calgary!
Tonight I am repainting the tank and side covers, starting on the seat template to carve it out.
Here's the design plan... A bit taller, farther forward (single-seat bike) to keep the visual weight of the bike even, build up the rear a bit and put the seated position into exactly where I actually sit.
Tuesday, finish and glass the seat. Apply my secret decal layout to the tank and covers.
Wednesday, finish the seat, sand, bondo, paint.
Thursday, if all is well, drink some beers! Maybe a once-over on the bike again, polish it up.
Friday, drop-off at the show!
A few minor odds and ends as well, registration, insurance, tail wiring, more cable management, charge the battery up and put a plate/tag bracket somewhere. The seat is top priority though!