What a big week.
All my parts have arrived this week so I have now done everything I can to the bike whilst waiting for barrels to be hogged out so I can build the engine.
New switch blocks are on, new front brakes are in, custom short front fender is on, grips are on, all wiring is tucked into the headlamp, a new threaded swing arm grease nipple/zort is fitted, and the rolling bike is off the build stand and parked ready for the engine.
I noticed how much of a lean it has on the side stand, so I just picked up a 1982 CB900 side stand to fit to the bike.
Photos of the finished roller soon - and then it is time to move to "stage two" and design the top and bottom triples for the Ducati USD front forks conversion. I was lucky to get ten minutes of Rex's (of T-Rex racing developments) time this week and he explained how to come up with the right formula for triples that will improve the handling on a CB750. Well worth calling in to see him.