But progress. Picked up the powder coating work (80 mile round trip) and installed the new bearings with a vary large vice. Railroad grade.
![Grin ;D](http://forums.sohc4.net/Smileys/default/grin.gif)
![](http://i157.photobucket.com/albums/t51/runeight/Suzuki%20GS400E/Build/image_41.jpeg)
![](http://i157.photobucket.com/albums/t51/runeight/Suzuki%20GS400E/Build/image_42.jpeg)
Did a little mockup.
![](http://i157.photobucket.com/albums/t51/runeight/Suzuki%20GS400E/Build/image_46.jpeg)
Rotor back from TrueDisk.
![](http://i157.photobucket.com/albums/t51/runeight/Suzuki%20GS400E/Build/image_43.jpeg)
And mocked up on wheel with New Avon tire. It will be quite a while before any of this is mounted.
![](http://i157.photobucket.com/albums/t51/runeight/Suzuki%20GS400E/Build/image_45.jpeg)
Rear wheel mockup. Sprocket being returned to fleabay seller. List one thing, send another doesn't fly with me. I'll eat the return ship to prove a point.
![](http://i157.photobucket.com/albums/t51/runeight/Suzuki%20GS400E/Build/image_47.jpeg)