Bike is all set for 2019! Roebling Road is in 4 days. My wife and I are driving from Michigan starting Thursday morning, with an overnight stop in Charlotte, NC then onto the track in Savannah, GA. Too hard to put 14 hours in one day so it will be a little bit vacation as well as some racing. I will practice Friday afternoon, then racing Sat/Sun, then back to the frozen North.
The bike is all set and ready to go with no time to spare. I will fire it this afternoon to bring it out of hibernation and get the new Motul 5100 moving through the system. I have double checked every wire and bolt on the bike and every system looks like a go.
I have a number of changes I am going to make to the bike for this year, after Roebling and NOLA (early March), including a new seat, adding a dash mounted oil pressure gauge, front fender, and a few more refinements. I am also planning on starting to build a new fuel tank. Im going with aluminum and will gas weld it together in my shop. After all the back and forth on my oil tank, I want to try to get my in-house aluminum welding up to speed. It may take longer than going to the welder but it keeps my ability to change things on the fly very much in tact. I have a design that will echo the tank on Brent's racer, as its fairly simple from a shape standpoint, and will hopefully be more ergonomic than my current tank, which I find limits my movement on the bike.
4 days...