Quick update, got probably two more filling and sanding sessions on the frame and then it's ready to prime. The crank is at ape, head & rods are at TMR porting, cylinders arrived to LLC machining. The goal is to have the motor ready to assemble in 4 weeks. Rods and crank are the biggest time part of this. Should be 3 week turnarounds on these.
While I wait for those, my swingarm and shocks should be done by Valentine's day. I should have my lower triple and front axle from TTR400 by then and my wheels built by then too. Get some paint on the frame and I can have the roller ready for the motor.