We're starting to make some real progress on the house. I've been spending as much time as I possibly can at the house in the evenings and on the weekends. All the electrical work is done on the inside and while I could I made a few minor framing updates, like adding a small walk-in pantry. A volunteer crew is replacing the roof and installing drywall this week. I'll be taking the day off tomorrow to help peel off the old roof. I've been searching for a reasonably plumber to set a new bathtub and shower. Once that is done along with the taping and floating I'll be able to get all the walls and ceilings textured at once. We still have a lot to do, but we'll get there.