Torqued, greased, and finished steering linkage, and steering box. New brakes and wheel bearings.
Installed EBC Rotors and wilwood dual pot calipers.
Just need to bleed the system.
New sway bar will be here Monday and then I can just about wrap up front end and move back to replace the leaf springs.
Sent from my iPhone using Tapatalk