Have built up a set of carbs for the bike, rebuilt the speedo that was on the bike as I wanted the original mileage to stay with it, have done a great deal of prep work on the tank and now should be ready to spray. Will get the paint tomorrow for it. Still waiting for the hand grips, master cylinder, clutch cable and clutch adjuster bolt to arrive. The led bulbs I had ordered from China, damn they sent the wrong units, so made a claim against them and have ordered some more. The led bulbs are for the gauges on the bike and will last a long time being able to put up with the bumpy Taranaki roads.