Well guys, allthough nearly a year behind scedule, the CRs new motor is installed and ready for testing.
We were held up for several months waiting for special one off valves to be made.
We should have had the head back along with the valves when the guy doing it told us we would'nt get the valves untill Feb 06.
Mike Rieck to the rescue. Mike managed to get us a set of 5mm stemmed stainless valves with 2mm larger heads on the inlets.
Allthough thanks to Mike we had every thing in place for the re-build, we had missed our spot with the engine builder and had to run the stock 736 motor for another year.
If we get any decent weather this weekend, it should be up and running.
We will take photos and get them posted as soon as posible.
Last weekend turned out to be a cracker for the team untill this morning.
It started with me going to a funeral on Friday and spending 12hours and £40 ($80) on booze in one of the local pubs. (yes my head did hurt Saturday morning

)
Saturday night saw us at one of the clubs we race with, The National Sprint Associations anual dinner and prize presentation.
Chris picked up several certificates for class wins and the overall title of Northern Sprint Champion (in his class) for the fourth year running. It was also confirmed by the clubs Chairman that he had also taken the Southern championship for the second time.
This year I am starting on a program of testing a new 175cc motor to attack International records later this year or in 2008.
The motor had been completed a few days earlier and I had arranged to collect it from the builder at the prize presentation.
I was expecting the cost to be in the region of £800 ($1,600), but got a nice supprise when I was handed the bill for £250 ($500).
The gentleman in question was Mr Ron Phillips of Fahron Engineering, he asked could he be involved in the project and said he was prepaired to only charge me the cost price for the parts fitted in exchange for addvertizing on the bike and the team clothing and he would also foot the bill for that.
He has also offered a full technical back up and will be available at all test sesions.
The cylinder for this motor has been devloped by the 2 stroke department at Queens University Belfast and has allready undergone extencive testing and utilises a stock HRC piston from another Honda model.
I thought, what a great weekend but this morning, "Oh #$%*" I had started work on the chasis and found it had some very cleverly
dissguised cracks in both frame and swing arm

I have tonight allready put out feelers for their replacment.
Just when you thought it was all going fine

But I'm still smiling,
Sam