Only difference is early pipes fitted over spigots that bolted into the head whilst later ones diddnt have the spigot but a loose flange and half round collets on the pipe so to fit late pipes to early head remove the spigots and use later hardware
To fit early pipes to a lete head fit spigots with the early hardware.
Mounting points may or may not line up but brackets can always be made for that