Hi all, back at it again, been away for work don't seem to be able to get much time to work on the bike at the moment.
Got my frame back from blasting and painting and began reassembly
Motor is now completely stripped, I had the cases bead blasted and pressure cleaned.
There were some minor issues with the case main one being the small casting that the points plate bolts too was cracked off, I was lucky enough to get one of the welders at work to repair it for me.
Found a replacement cylinder on eBay that has standard bore, just waiting on parts to be delivered before reassembly of the engine.
One of the biggest problems is finding a new bearing for the transmission "6008 NR" can't buy them with the correct groove width, so I have bought one with thin groove and given it to local machine shop, they say they can machine it so here's hoping.