I did more work last night on the new foot peg brackets, I modified the bolt pattern a bit to get them to bolt on properly.
Had to move the hole 0.080(2mm) off center, and enlarge the hole 0.090(2.?mm).
PERFECT fit..... Except I need to mill a bit off each bracket to get both bosses the bolts holes are in to touch the frame at the same time...
Thankfully I get to use the machines at work on my own time!!!
one side needs 0.115"(3mm) and the other 0.165" (4mm) removed...
These better be worth it... this is a LOT of work.... then I have to work on the linkages, a bushing for the brake side pedal, a shifter lever, linkages, and another bushing on that side as well.
Might have to rig up something for the brake light trigger as well.
As Far as my back hurting...
I can't see this bike being a long distance rider, but with 2 canyons to ride within 15 minutes of home.... I think I will put it to good use.
If nothing else it will be a conversation starter at the pump i'm sure.
I have mocked up the motor to fit the 4-1 i intend on running...
I already know what I want to do with that one.
Can't rember whose bike it is, but it has a ?suppertrapp muffler/spark supression end welded where the muffler would go.
Wicked looking.
And light!
l8r