A few days of down time were needed to sort out property lines and road allowances. As stated before I thought I might be 4" on the bad regarding road allowance. Had a team of surveyors here on Tues..$700.00...turns out I'm now 5 3/4" out!! Fun Money
I never dealt with the 1st building inspector since I was at the dentist for my daughter that day.
Decided the best approach was to jump over his head to the head of the Regional District Inspectors and deal with him alone.
I convinced him to visit the Island today....."something this guy does not normally do". He hummed and hawed, said I should go for a "Variance". ...........That takes 18 months here
I said that was not a solution I was happy with and came at him with these options...
#1 change the road side wall from 2 x 6 construction to 2 x 4..........gains me 3+ inches to the wall, but still leaves me 1 1/2+ inches on the BAD SIDE of things
#2. dig out the inside of the foundation and simply pour another sill. Ha, Ha, NOT!
#3. Slide my 2 x 6 wall on the concrete sill 1 3/4" overhanging the inside and when the concrete inside is laid up just bang in a 2x6 PT board along the length of the wall for support.
I had done my research all options were up to code but I hated the idea of doing #2. or #3, But #1 was still off of the legal boundary
He really went out of his way to help.
I'm tearing off the 2 x 6 roadside wall tomorrow, and then laying a 2 x 4 wall flush on the inside edge of the 8" concrete wall and we both walked away..........
Me almost in tears I was so grateful for this guy working with me as a guy trying his best to obey all the laws and codes.
It does pay to be honest.
P.S. He said to me just before he left
"just make sure you call ME for the rest of your inspections"
All hooked up with the BOSS