My 750 is better, not great yet.
Waiting for installation I have: new pipes, new rear fender, new plugs, airfilter, spedo cable seal, front fork taper roler bearing kit, Dyna ignition kit, carb rebuild kit, (need to order the Sync Pro tool $94....)
I have the Local Chrome shop priced to chrome tail light bracket, grab bar, headlight mounts, front fender & all four new solid pipes.
spokes have been tuned, but they look like #$%*, need wire brush and a little paint.
Engine runs, but not right, Carbs out of sync and holes in pipes make it useless to adjust with out the new pipes.
Still need instrument faces (which require me to have brackets & housings Powder coated...), solid state electrics, Odyssey sealed battery (no more damaged right lower pipes!)
Sooo;
do I turn her into a pile of parts and expect to ride again in 45 days?
Or..
do I clean my face shield, fire her up and head to the twisty roads around Uwharrie National Forest...