Hi,
Here we are again, after some months of collecting and waiting for parts.
The frame is almost finished, I am still waiting on the oiltank, but it should be rady within a couple of weeks.
The bottom end of the engine is already finished. The top parts of the engines (yes, i've got 2 F2-engines) are measured up. And the result was very good: the 8 pistons are still very good, I can reuse the with only new standars segments, the 16 valves are all good, the cilinders should be rehoned. On 1 cilinderhead the exhaust valve guides should be replaced, but the other cilinderhead is still OK. Pictures about the engine will follow.
I have also bought an ultrasoon cleaner, so I have cleaned en rebuilded 4 carburettors. Somebody need a carb?
The "gordon framekit" is also installed!!
I post some pictures of the frame, the new rearsteps, the carburettors.
That's it for now!
greetings
g