Hey everyone, thanks for the comments.
So heres where I am since my last update:
- Got the wiring loom, coils and some of the other electrics back on.
- Got exhaust mounted.
- Made up a new fusebox.
- Threw on the tank and seat temporarily.
- Overhauled the right side handlebar controls.
Well the PO had tapped one of the exhaust stud holes to 8mm, must have snapped a stud or something and drilled it bigger and probably drilled the exhaust clamp too. I didn't get the exhaust clamps with the bike so I decided to get a 'special' bolt made up. My uncle works somewhere where they do some machining so he was able to get an 8mm bolt welded to a 6mm bolt in stainless and so I just threaded the 8mm part into the head and then had the 6mm part sticking out to take the exhaust clamp.
Heres a pic of the 8mm bolt in place
My 'special' bolt, had to grind down the weld a bit further before I installed it.
I used the back of the old fusebox and bolted a 4 blade fuse box onto it as my new fusebox. The old one was all melted and I had no cover for it so this is why I decide to do this. Its after ending up a bit bulkier that I thought it would so I think I might redo it and solder all the wires underneath the fusebox itself when I get time to do it.
Heres my handlebar control refurbishment, the PO had cut all the wires off for no apparent reason so I ended up having to solder on all new wires. I polished up all the contacts and greased all moving parts and put it all back together. I also polished the outside of the controls.
Controls all taken apart
Some of the new wires soldered on and heatshrinked
The finished product
My method of Identifying the wires as I didn't have any wire in the right colours