Alright, a few little things to add...
The top triple clamp has been painted and drilled for gauge mounting.
And the headlight.... Tough to get pics of this that do it justice. The bad? I scratched the inner mounting ring for the bulb. So, right at the top, there are two chips in the paint. Meh.
At this point, everything that is "done" is going into the house, so nothing is damaged while working on the other bike or my motor. Once the engine is done, I'll flip it on its side and lower the frame down over it to get it mounted. Much easier than lifting the motor into the frame, probably scratching it. Otherwise, I'd be assembling it as a rolling chassis at this point.