I worked 58.5 hours this week so I didn't have much time to work on the bike.
I'm going to order tires,seat,wiring stuff, fake oil tank (electrical box) brake pads, air filters and a few more odds and ends this weekend. I'm also going to cut the bike up and weld in th TCbros hardtail kit on saturday.
I will also be going with a set of cb550 carbs on the 500 engine. I think they should be fine.
I did snap this pic of the two bikes in the basement.