Back to work! Stalled lately with a baby on the way and my company sold! So went house crazy. Replaced all the flooring, painted, landscaped, veggie garden, new baby safe car, and all that jazz. Anyhow, with all that out of the way I have a little under 2 months now to finish 4 bikes. On to Rhonda. Made a valve guide drift, heated head in the oven (the wifey loved the smell) to 295 degrees, and shot some liquid CO down each guide and gently tapped them out. Worked a treat.
Left to do, send head out for mild porting, then reassemble. Get the jugs bored. Assemble top end. Yay! Aside from maybe ordering a bunch factory correct hardware from Z1 that will put her back on the road just in time for a Summer daily rider and make the 4th of July Hollister Rally. Unfortunately though my time will be consumed with other bikes that need attention, and after that baby Kylie (not unfortunate), so a update after might be awhile. Wish me luck! LOL