Believe it or not, I was walking through some stockroom, was bummed I couldn't find one on the yard, and looked in a little cubby box on the shelf and presto, an NOS unicorn hanging out for the taking.
I'm on a TIGHT schedule...have to restore this in less than 8 weeks to make it to Barbers.
It looks like...
August 16th-23rd - Send bodywork to Marbles Motors for respray in Candy Ruby Red. Strip bike to bare frame, gather all hardware and box for replating wherever that may be
August 23rd-30th - Drop frame, swingarm, and all small incidentals off for powdercoating after carefully removing VIN plate. Order tensioner, gasket set, etc.
August30th-September 6th - Replace head gasket, soda blast mostly assembled engine, respray in engine enamel #1615, Send parts out to be rezinc'd.
September 6th-13th - Go get NOS Honda spokes and yellow cad nipples, pull my wheels apart, replace, true. Order Dunlop K70's for front and rear with new tubes.
September 13th-20th - Mount tires, await bodywork, place engine back in frame assuming hardware is back. Order tank emblems and lower trim, along with all caution decals. Maybe place order for battery and chain.
September 20th-27th, Install bodywork if haven't already, Start reassembly process, Place battery and chain on order if not already here.
September 27th-Oct. 4th- Extra time, TBD
Oct 4th -12th - shakedown before Barbers, prep and check over