Well here's the 1 month update: School + Work + GF been taking up most of my time. However, new gauge faces are being made on AI by a classmate, which will then be cut on the laser cutter at school by a different guy I know. Since I don't have that much time anyway I decided to just order a fiberglass seat from Sean @ Roccity Cafe. Once that arrives, I'll be taking my frame to a machine shop where another friend works to have the frame worked on. I will have him fab up a batter box low in the "Triangle", weld a loop on the back section plus put sheet metal to make a tray for electronics, weld some triangles in for support and sturdy the frame all around. I've just been ordering tons of parts anticipating the rain to come so I can have time to work on the bike. I found that CB900F shocks are 14.5" and feature an Eye-to-Clevis mount so I'm bidding on a set on eBay for <$65. Tank has been hot-dipped, just need to finish cleaning it up, toss it on the electrolysis then seal it up.